Pillar sub-scores

A pillar mixes what is endured and what is chosen; a grade is not the average of the pillars.
●●● = documentation available
Energy
EnergyB
●●●●
Water
WaterB
●●●●
Land & biodiversity
Land & biodiversityB
●●●●
Local impact
Local impactB
●●●●
Transparency & governance
Transparency & governanceB
●●●●

“Rated B on site, C on project & process.”

Tracked indicators

IndicatorValueReadingStateSource
Energy
Local grid carbon intensity How much CO₂ is emitted to produce the electricity the site will consume, based on the regional grid. The lower the value, the better. 42 gCO2e/kWh Measured Fictional grid intensity dataset (test) — accessed 2026-07-01 · archived
Grid connection capacity / proximity How easily the site can be connected to the power grid: available capacity and distance to the nearest substation. adequate Measured Fictional connection capacity map (test) — accessed 2026-07-01
Grid congestion / connection queue How congested the local grid is: the more saturated, the more the connection competes with other users. moderate Measured Fictional connection queue registry (test) — accessed 2026-07-01
PUE (announced energy efficiency) The announced energy efficiency: total electricity used versus what actually powers computing. Closer to 1 is better. The lower the value, the better. 1.18 PUE Announced Fictional permitting file, energy section (test) — accessed 2026-07-01
Water
Local water stress Water tension in the area: in an already water-scarce region, withdrawals weigh more heavily. moderate Measured Fictional water restriction registry (test) — accessed 2026-07-01
Water body status The ecological health of the affected river or aquifer, per the EU classification (from 'high' to 'bad'). good Measured Fictional water body status report (test) — accessed 2026-07-01
Basin withdrawal pressure How intensively water is already withdrawn from the basin: a heavily-tapped basin ill affords a new user. low Measured Fictional withdrawal database (test) — accessed 2026-07-01
Cooling technology + announced water volume The cooling technology chosen and the water volume it will consume, as announced by the operator. hybrid_adiabatic Announced Fictional permitting file, cooling section (test) — accessed 2026-07-01
Land & biodiversity
Overlap / distance to protected areas How close the project is to protected natural areas (Natura 2000, nature reserves…). distant_over_5km Measured Fictional protected areas layer (test) — accessed 2026-07-01
Soil status (artificialized / natural / agricultural) What the land was before: already built (brownfield), natural, or farmland — sealing farmland or nature weighs most. artificialized Measured Fictional soil status inventory (test) — accessed 2026-07-01
Ecological corridors (TVB) Whether the project severs a wildlife corridor (green-and-blue network). marginal Measured Fictional ecological corridors layer (test) — accessed 2026-07-01
Project ground footprint The project's ground footprint in hectares: the larger, the greater the land impact. The lower the value, the better. 12 hectares Measured Fictional building permit (test) — accessed 2026-07-01
Avoid-reduce-offset measures / heat recovery Measures to avoid, reduce or offset harm, and to reuse the heat produced. Not disclosed Missing Fictional ICPE dossier read — no heat-recovery/ERC commitment found (test read-trace) — accessed 2026-07-01
Local impact
Municipality socio-economic profile The host town's social profile. A safeguard: a project must never improve its grade by locating in a vulnerable town. neutral Measured Fictional census profile (test) — accessed 2026-07-01
Absorption capacity (project size vs municipality) The project's size relative to the town: a very large project in a small town disrupts more. The lower the value, the better. 14.1 MW per 1000 inhabitants Measured Fictional census, municipality population 8500 (test) — accessed 2026-07-01
Technological hazard / nearby Seveso sites The presence of hazardous industrial sites (Seveso) nearby, adding risk to the surroundings. none_within_5km Measured Fictional industrial hazard registry (test) — accessed 2026-07-01
Announced jobs The number of permanent jobs announced, relative to project size. More is better. The higher the value, the better. 37.5 permanent jobs per 100 MW Announced Fictional operator press release, 45 permanent jobs (test) — accessed 2026-07-01
Announced tax revenue The tax revenue the project would bring to the town, as announced. announced_unquantified Announced Fictional council deliberation minutes (test) — accessed 2026-07-01
Observed level of opposition The scale of observed opposition: appeals, petitions, mobilizations reported by the press. local_isolated Measured Fictional local press review (test) — accessed 2026-07-01
Elected officials' position (voted facts only) Elected officials' position as expressed by official votes only (council decisions), with no personal judgment. favorable Measured Fictional council vote record (test) — accessed 2026-07-01
Transparency & governance
Consultation / consent / governance (procedural proxies) The quality of the democratic process: public inquiry held, environmental authority opinion, appeals, CNDP referral.
  • Public inquiry held
  • Environmental authority opinion: favorable with reservations
  • No CNDP referral
  • Legal appeals: 0
  • Council deliberations: favorable
Measured Fictional public inquiry registry (test) — accessed 2026-07-01
Documentation transparency / file availability How genuinely accessible the project's file is to the public: published studies, figures and commitments. partial Measured Fictional publication registry (test) — accessed 2026-07-01

Operator response

Fictional operator response (test fixture): we confirm the announced PUE target and dispute nothing. (2026-06-20)

A factual error? Use “Report an error”, attaching a source or supporting document.

State of the available data

22 indicators tracked · 17 measured · 4 announced (unverified) · 1 missing.

Contestation & signal

Sourced facts — never an input to the grade.

Grade history

  • Site grade at this dateB
    Project & process grade at this dateC
    Initial scoring of fictional fixtures on draft methodology (engine bring-up)
Methodology 0.1.0 · Scored on 2026-07-05 scoremydatacenter.org