Pillar sub-scores

A pillar mixes what is endured and what is chosen; a grade is not the average of the pillars.
●●● = documentation available
Energy
EnergyB
●●●●
Water
WaterC
●●●●
Land & biodiversity
Land & biodiversityB
●●●
Local impact
Local impactC
●●○○
Transparency & governance
Transparency & governance

“Rated B on site, but C on “Water”.”

Tracked indicators

IndicatorValueReadingStateSource
Energy
Local grid carbon intensity How much CO₂ is emitted to produce the electricity the site will consume, based on the regional grid. The lower the value, the better. 44 gCO2e/kWh Measured RTE eCO2mix — national CO2 intensity 2026-07-13T21:45:00+00:00 (44 gCO2/kWh) — accessed 2026-07-14
Grid connection capacity / proximity How easily the site can be connected to the power grid: available capacity and distance to the nearest substation. adequate Measured Caparéseau (RTE S3REnR) — poste MOUCHE (LA) at 1.2 km: 23.4 MW available hosting capacity (updated 13/06/2026) — accessed 2026-07-14
Grid congestion / connection queue How congested the local grid is: the more saturated, the more the connection competes with other users. low Measured Caparéseau (RTE S3REnR) — poste MOUCHE (LA) at 1.2 km: 20.0% reserved-capacity fill rate (updated 13/06/2026) — accessed 2026-07-14
PUE (announced energy efficiency) The announced energy efficiency: total electricity used versus what actually powers computing. Closer to 1 is better. The lower the value, the better. — PUE
Water
Local water stress Water tension in the area: in an already water-scarce region, withdrawals weigh more heavily. high Measured VigiEau — drought-restriction status at point (accessed 2026-07-14) — accessed 2026-07-14
Water body status The ecological health of the affected river or aquifer, per the EU classification (from 'high' to 'bad'). moderate Measured EEA WISE (WFD 2022) — water body FRDR2006A 'Rhône de Vernaison': ecological status class 3/5 — accessed 2026-07-14
Basin withdrawal pressure How intensively water is already withdrawn from the basin: a heavily-tapped basin ill affords a new user. low Measured Hub'Eau BNPE — commune 69259: 0.217 Mm3 withdrawn in 2023 (all uses, provisional pressure band) — accessed 2026-07-14
Cooling technology + announced water volume The cooling technology chosen and the water volume it will consume, as announced by the operator.
Land & biodiversity
Overlap / distance to protected areas How close the project is to protected natural areas (Natura 2000, nature reserves…). near_1_to_5km Measured INPN / IGN API Carto — Natura 2000 & ZNIEFF overlap by distance ring — accessed 2026-07-14
Soil status (artificialized / natural / agricultural) What the land was before: already built (brownfield), natural, or farmland — sealing farmland or nature weighs most. artificialized Measured IGN API Carto GPU — PLU zoning 'UEi2' — accessed 2026-07-14
Ecological corridors (TVB) Whether the project severs a wildlife corridor (green-and-blue network). Not disclosed Missing
Project ground footprint The project's ground footprint in hectares: the larger, the greater the land impact. The lower the value, the better. — hectares
Avoid-reduce-offset measures / heat recovery Measures to avoid, reduce or offset harm, and to reuse the heat produced.
Local impact
Municipality socio-economic profile The host town's social profile. A safeguard: a project must never improve its grade by locating in a vulnerable town. sensitive Measured INSEE Filosofi (via data.gouv) — commune 69259: median disposable income 17140 €/consumption unit — accessed 2026-07-14
Absorption capacity (project size vs municipality) The project's size relative to the town: a very large project in a small town disrupts more. The lower the value, the better. 0.1023 MW per 1000 inhabitants Measured INSEE populations légales via geo.api.gouv.fr — Vénissieux (65502 hab.) ; puissance 6.7 MW (DCWatch ODbL, export 7dd5b5e9). Ratio MW/1000 hab, calcul déterministe — accessed 2026-07-14
Technological hazard / nearby Seveso sites The presence of hazardous industrial sites (Seveso) nearby, adding risk to the surroundings. seveso_low_within_5km Measured Géorisques — classified installations (Seveso status) within 5 km — accessed 2026-07-14
Announced jobs The number of permanent jobs announced, relative to project size. More is better. The higher the value, the better. — permanent jobs per 100 MW
Announced tax revenue The tax revenue the project would bring to the town, as announced.
Observed level of opposition The scale of observed opposition: appeals, petitions, mobilizations reported by the press. Not disclosed Missing
Elected officials' position (voted facts only) Elected officials' position as expressed by official votes only (council decisions), with no personal judgment. Not disclosed Missing
Transparency & governance
Consultation / consent / governance (procedural proxies) The quality of the democratic process: public inquiry held, environmental authority opinion, appeals, CNDP referral.
Documentation transparency / file availability How genuinely accessible the project's file is to the public: published studies, figures and commitments.

Operator response

The operator can send us a response about this datasheet. When a response is received and publishable, it appears here, clearly attributed and dated.

A factual error? Use “Report an error”, attaching a source or supporting document.

State of the available data

22 indicators tracked · 11 measured · 0 announced (unverified) · 3 missing.

Grade history

Methodology 0.1.0 scoremydatacenter.org